Train-Sim.Com
MSTS Activity Design

Lenora & Mt.Sicker

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #2328

Charter Member · 75 posts

was a small copper mining railway on Vancouver Island in the late
1800's . They used Shay locos for the steep grades and tight curves.{narrow gauge}. One part of the route consisted of three switchbacks
up to the top of a mountain and then on to Crofton. The ore was
concentrated in Crofton and shipped to Tacoma.
Are there any activities like this?
Start at the bottom of the hill with 10 loaded cars.
Each switchback would have a different length and grade.
Each grade you could pull some part of the 10 cars.
The idea is to see how fast you can get the 10 cars to the top of the hill.
We could even start a competion, for best time .
Dash-9 narrow gauge.
Just an idea.
squaregrass

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | How To... | File Library ] Copyright © 2004 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured January 5, 2005. About this archive.