Train-Sim.Com
MSTS Activity Design

Glorieta Pass Activites

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #1768

Member since Oct-2-02 · 568 posts

Glorieta Pass Activites – image 1

I d/ld ATSF Glorieta Pass and it is an excellent route and I am in the process os making Southwest Chief Activities for the route one Westbound and one Eastbound based on an Amtrak Timetable and using a make up of the actual consist.Chris
Glorieta Pass Activites – image 2 Projects:
Santa Fe Needles Sub:20% done
Santa Fe La Junta Sub:10% done
Pacific Parlour Car:33% done

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

RE: Glorieta Pass Activites, akzim, Jul-21-03, 09:29 AM, (1) RE: Glorieta Pass Activites, Texas Eagle 550, Jul-23-03, 04:20 PM, (2) RE: Glorieta Pass Activites, akzim, Jul-23-03, 06:07 PM, (3) RE: Glorieta Pass Activites, akzim, Jul-23-03, 06:08 PM, (4) RE: Glorieta Pass Activites, ATSF, Jul-24-03, 09:36 AM, (5) RE: Glorieta Pass Activites, akzim, Jul-28-03, 11:33 PM, (6)

Conferences | Topics | Previous Topic | Next Topic

Member since Oct-2-02 · 568 posts

RE: Glorieta Pass Activites

Glorieta Pass Activites – image 3

Yes. It might be a while as I am having problems with the westbound activity because of the Speed Limit Problem on the Dalies Line toward Isleta. I also have a Amtrak Activity Pack done. I have all the Beta Testing done for those activities. Traffic is light on most of them where in about 3 of them I have included up to 12 AI Trains. I plan to include these activities with my activity pack.Chris
Glorieta Pass Activites – image 4 Projects:
Santa Fe Needles Sub:20% done
Santa Fe La Junta Sub:10% done
Pacific Parlour Car:33% done

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 406 posts

RE: Glorieta Pass Activites

LAST EDITED ON Jul-24-03 AT 10:02 AM (EDT)

I cant find anything wrong with the way the speed limits are set up. They drop to 0 right before MP 24 going eastbound in both pass and frt service. They work ok going westbound. I am wondering if it is a wye problem, as the Dalies Isletta Belen triangle is a giant wye, and the Dalies Isletta side of the triangle has smaller wyes at each end.
Anyone have any ideas?
Thanks in advance.
Edit - I took a section of track out of the Dalies and Isletta wyes an the speed limit still dropped to 0 - Ill keep looking.

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jun-1-03 · 13 posts

RE: Glorieta Pass Activites

u can send me the activity to me at akzim@yahoo.com and u can send me the non default zip files in the folder.
Thanks

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2002 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured August 14, 2003. About this archive.