Train-Sim.Com
MSTS Activity Design

Mesaba Electric activities

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #1408

Charter Member · 330 posts

Could one of you activity writing wizards do one for the Mesaba Electric route? I've tried, but without much success. I put my train into a double-ended siding to wait for an oncoming AI train, but when I do the AI train stops before it gets to the other end of the siding. Apparently when I enter that siding, it also opens the points at the other end stopping the AI train. Is this true?

Dave

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 330 posts

RE: Mesaba Electric activities

If I back up, regardless of the amount, the AI train "keeps it's distance" from me. If I back up ten feet, he comes forward ten feet. If I back up five miles, he stays with me matching my speed and braking and "keeping his distance."

Dave

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2002 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured January 5, 2005. About this archive.