Train-Sim.Com
MSTS Route Design

GT Holly Sub Update

GT Holly Sub Update – image 1

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #6923

Member since Sep-22-02 · 7 posts

Finished all of the track laying last night. Looks like about 69 miles from downtown Detroit to the Durand yard.Next step will be lengthening the crossing tracks (C&O, Ann Arbor, and three GT subs).

Daniel Ward
The Good Track Railroad is coming!

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 156 posts

RE: GT Holly Sub Update

Looking forward to see your route when it's all done with the scenery and train consists. Keep up your good work for this route. I am still thinking about building the route of Canadian National Bala track territory but not sure how far I want to build? Will let everyone know when I start with this. John

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2002 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured November 15, 2002. About this archive.