I thought I would share some thoughts on creating long tunnels. I know someone is working on the front range of the D&RGW, which will probably involve the MOffat at 6+ miles, and someone has also done the BNSF through Cascade Tunnel at 7+ miles.My own experience is (so far) limited to 7,854' at Sandy Ridge (VA).In this instance, I got my markers from the marker program posted last year to the file library, Convert31 I believe it is called. Often this does not produce completely accurate results, but in the case of the KP sub. it was right on.Creating the long summit tunnel was a matter of trial and error, but I found it was helpful if I placed the longest straight piece in the set at the correct elevation, and lined up as close as possible by eye to the line of markers. Unfortunately, the longest piece is pretty short. It would be nice if MSTS would produce 500M and perhaps 1000M pieces in any future release.After placing the longest piece, I then added pieces to it, until I reached the other end, and noted the offset. Then I went back and rotated the first piece slightly and repeated the process. It took 8 or 10 tries to get it within an acceptible error range, about 2 or 3 meters. Had I placed the piece within the center of the tunnel first, I might have improved on this.After getting the tunnel placed, I then connected the track (at Trammel Switch) to the tunnel with a short piece of Dynamic - which was not curved, rather I just needed to adjust the length. I had to adjust the last curve in the siding slightly to get perfect alignment.One of the more annoying aspects of Dynamic track is that you can get a seemingly perfect joint, no blue poles remaining, and still get a "bump" when you run the train. I have found that it is necessary to get in real close, and examine the joint(s) from all angles to be sure they really are good.The MSTS box, should carry this warning message"
1. Route editor may be addictive, recommend a twelve step process.
2. Before using route editor, supply self with a bucket of prozac.J. H. Sullivan, P.E. (retired)
Printer-friendly page | Edit | Reply | Reply With Quote | Top
RE: Long Tunnels, especially straight ones, enocell, Sep-21-02, 03:22 PM, (1) RE: Long Tunnels, especially straight ones, redgar, Sep-22-02, 12:01 PM, (2) RE: Long Tunnels, especially straight ones, dwkarch, Sep-22-02, 02:35 PM, (3) RE: Long Tunnels, especially straight ones, landnrailroader, Sep-22-02, 04:49 PM, (4) RE: Long Tunnels, especially straight ones, Hoosac, Sep-23-02, 09:55 AM, (5) RE: Long Tunnels, especially straight ones, calr, Sep-23-02, 11:22 AM, (6) RE: Long Tunnels, especially straight ones, mivone, Sep-23-02, 11:45 AM, (7) Rollins Pass route? Great!!, markhyams, Sep-23-02, 10:35 PM, (8) RE: Rollins Pass route? Great!!, dwkarch, Sep-24-02, 05:46 PM, (10) RE: Rollins Pass route? Great!!, markhyams, Sep-24-02, 05:52 PM, (11) RE: Rollins Pass route? Great!!, dwkarch, Sep-24-02, 06:07 PM, (12) RE: Long Tunnels, especially straight ones, kenoman6, Sep-24-02, 02:20 AM, (9) RE: Long Tunnels, especially straight ones, LawrenceKellie, Sep-24-02, 07:37 PM, (13)
Conferences | Topics | Previous Topic | Next Topic





