I have noticed a problem with a trick I had been using, so this is to warn others (or receive corrective info) about it.When laying track (without dynamics), often there is a bit of a gap remaining when track is joined, eg when closing a wye. The track would join and the blue poles disappear, but the small gap (about 0.1m) was still visible. To close this gap, I had been using a homemade 0.25m straight piece, laying track up to the gap on one side, then putting in the 0.25m gap filler, then laying up to the gap filler from the other side. This would overlap the gap filler a little and close it visually, and the blue poles still disappear.The problem is two-fold. First, when running a train over the filled gap, the cars will compress into each other because the track in effect doubles back on itself for the overlap. This could still exist for other track laying where the track overlaps a little naturally without the gap filler, and I've not explored the physical effect on equipment couplers, derailing.The second, more serious problem is that even though the blue poles disappear and the pieces can be selected and deselected and everything appears to work fine, after saving and restarting the Route Editor, the gap filler piece will produce an "adjacent pieces not loaded" error upon selection. This means manual deletion and track database rebuilding (which for me is always an adventure). I suspect that this problem stems from the small size of the gap filler, such that there are three blue poles (the original edge of the gap, plus the two ends of the added gap filler) all close enough to attach to the piece from the other side of the gap.The proper solution is probably to make a version of the 0.25m piece that is only a scenery object and not functional track, and just slip it under the connected but visual gap. 3footer
Printer-friendly page | Edit | Reply | Reply With Quote | Top
RE: Closing Track Gaps, sniper297, Aug-18-02, 11:28 PM, (1) RE: Closing Track Gaps, calr, Aug-19-02, 01:20 AM, (2) RE: Closing Track Gaps, 3footer, Aug-19-02, 02:53 PM, (3) RE: Closing Track Gaps, LawrenceKellie, Aug-19-02, 03:06 PM, (4) RE: Closing Track Gaps, sniper297, Aug-19-02, 04:30 PM, (5) RE: Closing Track Gaps, 3footer, Aug-19-02, 06:23 PM, (6) RE: Closing Track Gaps, OkrasaGhia, Aug-20-02, 10:57 AM, (7) RE: Closing Track Gaps, 3footer, Aug-20-02, 04:27 PM, (8) RE: Closing Track Gaps 3' dynamic track, timken, Aug-20-02, 07:14 PM, (9)
Conferences | Topics | Previous Topic | Next Topic


Next, the part I haven't tried yet. Make some "dumb" 3' gauge track sections. It might be best to lay these and overlap as needed to connect the existing problem spot before putting in the dynamic track, so the DT can be properly lined up with the route! A bit of a hassle, but it could solve some otherwise real problem spots!