I've got a couple or three more days of work on the sound files for the K-36, but needed a break. Here's Baker City's yard, with the UP main, and SVRR narrow gauge tracks. It's close, but not perfect, as I haven't come up with detailed maps of 1938, only 1911 and a not very detailed 1944.
I live 3 blocks to the right of this view, and it is amazingly accurate, thanks to David Beach's help!
Some of the track (there's a few to add) was dual gauge trackage, I suspect I can do this with Xtracks, but am not sure yet.Tim Muir did the gorgeous little hack, from SVRR drawings and photos I took a couple weekends ago up at Sumpter and the operation.Sniper! This route, I am planning to make available, probably when The tracks roll into Sumpter, the 1/2 way point or a little less. Figure 2-4 months though, as I'm doing a lot opf research, and trying to get it accurate.I hope to set up some activities that have mainline trains rolling through town. If possible the AI passenger train should make a station stop. UP 800's (4-8-4's) Challengers, 2-8-8-0's and Mikes would be at home here. There will be about 10 miles of UP mainline, with some real switching possibilities, including the dual gauge interchange with the svrr, that switched all the mills. Jon Davis is working on a Uintah and Sumpter version of the 2-6-6-2 Narrow gauge mallet, #251, that operated here!
Steve T.
Printer-friendly page | Edit | Reply | Reply With Quote | Top
RE: K-36 visits Sumpter Valley RR, jerseycentral, Aug-09-02, 11:48 PM, (1) RE: K-36 visits Sumpter Valley RR, timken, Aug-09-02, 11:56 PM, (2) RE: K-36 visits Sumpter Valley RR, OkrasaGhia, Aug-10-02, 10:44 AM, (3) RE: K-36 visits Sumpter Valley RR, timken, Aug-10-02, 12:16 PM, (4) RE: K-36 visits Sumpter Valley RR, OkrasaGhia, Aug-10-02, 01:38 PM, (5) RE: K-36 visits Sumpter Valley RR, Adam3291, Aug-10-02, 02:05 PM, (6)
Conferences | Topics | Previous Topic | Next Topic

New LOGO in progress!