Train-Sim.Com
MSTS Route Design

Message Areas - "About Signal configuration files"

Train-Sim.Com Message Areas

"About Signal configuration files"

Email this topic to a friend
Printer-friendly version of this topic
Bookmark this topic (Registered users only)
Previous Topic | Next Topic Conferences MSTS Route Design (Protected) Original message
ruifonseca (36 posts)
Jun-01-02, 09:11 AM (EDT) "About Signal configuration files" In the techdocs, they explain about the Signal Aspect ( SigAsp_ ) and they show at maximum these 8 values:Stop
Stop_and_proceed
restricting
approach_1
approach_2
approach_3
clear_1
clear_2I want to write configuration files for the Portuguese Signals, and truth is, I have a 3 signal head wich may show 2 stop_and_proceed aspects, and 3 clear aspects...So my question is:
I am I restricted to these 8 values for sigasp_ or is it alright to create stop_andproceed_2 or clear_3 ? Alert Edit | Reply | Reply With Quote | Top
Table of Contents

Subject Author Message Date ID RE: About Signal configuration file... goonybird Jun-01-02 1 RE: About Signal configuration file... ruifonseca Jun-03-02 2

Lobby | Topics | Previous Topic | Next Topic
Messages in this topic
goonybird (10 posts)
Jun-01-02, 01:00 PM (EDT) 1. "RE: About Signal configuration files" I'm not certain about my response here but here goes. The original eight aspects are the only ones that can be recognized in play. I believe creating more aspects cannot be done; I don't think you can alter the ones that came packaged with the game. I may be wrong though....... Remove | Alert Edit | Reply | Reply With Quote | Top
ruifonseca (36 posts)
Jun-03-02, 09:52 AM (EDT) 2. "RE: About Signal configuration files" Well, Thanks anyway Remove | Alert Edit | Reply | Reply With Quote | Top

Lock | Archive | Remove

Lobby | Topics | Previous Topic | Next Topic

Restored from the Train-Sim.Com archive, captured June 7, 2002. About this archive.