Train-Sim.Com
MSTS Route Design

Message Areas - "Is Categorizing Track Sections Possible?"

Train-Sim.Com Message Areas

"Is Categorizing Track Sections Possible?"

Email this topic to a friend
Printer-friendly version of this topic
Bookmark this topic (Registered users only)
Previous Topic | Next Topic Conferences MSTS Route Design (Protected) Original message
beadyboy (26 posts)
Nov-11-01, 09:01 PM (EST) "Is Categorizing Track Sections Possible?" I'd like to know if anyone out there can manage to categorize the track sections available in the game. Eg: Put all single line sections into a category of their own, perhaps even a sub-folder of Track Sections. This would make it much easier to find the required pieces.Otherwise possibly more categories like: Single Track Sections, Double Track Sections, 3 x Track sections, points etc.. Alert Edit | Reply | Reply With Quote | Top
Table of Contents

Subject Author Message Date ID RE: Is Categorizing Track Sections ... LawrenceKellie Nov-11-01 1 RE: Is Categorizing Track Sections ... akochan Nov-11-01 2 RE: Is Categorizing Track Sections ... rdamurphy Nov-11-01 3

Lobby | Topics | Previous Topic | Next Topic
Messages in this topic
LawrenceKellie (598 posts)
Nov-11-01, 10:47 PM (EST) 1. "RE: Is Categorizing Track Sections Possible?" It is an impossibility. MS/KUJU developed it to read the file names and sort accordingly. If you change the file names, the tracks will not be loaded.Lawrence Remove | Alert Edit | Reply | Reply With Quote | Top
akochan (76 posts)
Nov-11-01, 10:47 PM (EST) 2. "RE: Is Categorizing Track Sections Possible?" They are categorized. The list is in order of number of tracks first, then length second (for the most part). I don't see how that isn't enough categorization... It's not like there's hundreds of pieces. And the one's you're using repeatedly end up in the selection box too. Remember that unless it's a yard or a mountain that train tracks are generally straight, boring, and repetitive.-Andy
akochan@crosswinds.net Remove | Alert Edit | Reply | Reply With Quote | Top
rdamurphy (107 posts)
Nov-11-01, 11:48 PM (EST) 3. "RE: Is Categorizing Track Sections Possible?" On the Moffat Tunnel Route, the track is anything but long, straight and repetitive. One short one mile section took almost two days!Rob Remove | Alert Edit | Reply | Reply With Quote | Top

Lock | Archive | Remove

Lobby | Topics | Previous Topic | Next Topic

Restored from the Train-Sim.Com archive, captured January 23, 2002. About this archive.