After taking another couple months off (will I ever finish this route?? geez, I don't know ), I've resumed work on the WCRR again. I stripped about 4 square km of terrain of the trees I had given it because I wasn't happy with how things were working out. I then replaced the trees with a slightly different tree and narrower forest regions with backdrop trees behind them where necessary. I took a couple shots of what I did this morning:1. DEDs have been installed in three places so far - I'm still contemplating a fourth one.2. New water texture has been applied (more like copied - geez, that was hard ). I like this one for now, but will have to see how it works with the log pond.3 & 4. The county newspaper plant was a bit too small for my liking so I replaced the old building with three bigger ones and added the concrete slab dock.5. The furniture factory was lacking something so I added another building to it and moved them around a bit.I also installed a new road bridge this morning, but I forgot to snap a shot of it. Maybe I'll remember to catch it for my next update.Shawn
Attachments
http://www.train-sim.com/dcforum/User_files/411a1b3c5bb95a5d.jpg
http://www.train-sim.com/dcforum/User_files/411a1b495bdcc259.jpg
http://www.train-sim.com/dcforum/User_files/411a1b585bfeb864.jpg
http://www.train-sim.com/dcforum/User_files/411a1b615c2554fa.jpg
http://www.train-sim.com/dcforum/User_files/411a1b695c43687a.jpg
Printer-friendly page | Edit | Reply | Reply With Quote | Top