I'm pretty intrigued and impressed by some vegetation shapes and textures mentioned in this thread:http://www.train-sim.com/dcforum/DCForumID3/24208.htmlThe same Czech website also has some track and terrain textures, and I think the acleantrack1.ace is one I might like to adapt or adopt. I noticed that the roadbed texture contains 11 whole ties, and I began comparing that with others in the default routes or in a few other routes I've downloaded or purchased. Currently I've been using a texture with 12.The textures varied from containing 7 to 12 whole ties. Can anyone tell what prototype engineering might recommend? As I might do some minor editing to the texture, and since the texture is quite high quality, I could change the number of ties to give a different prototype spacing.
--- Phil Voxland
Printer-friendly page | Edit | Reply | Reply With Quote | Top
RE: # of ties per acleantrack1.ace texture, markhyams, Jul-23-04, 09:14 PM, (1) RE: # of ties per acleantrack1.ace texture, sniper297, Jul-23-04, 11:10 PM, (2) RE: # of ties per acleantrack1.ace texture, Roman, Jul-24-04, 05:57 AM, (3) RE: # of ties per acleantrack1.ace texture, sniper297, Jul-24-04, 11:15 AM, (4) RE: # of ties per acleantrack1.ace texture, Roman, Jul-24-04, 02:55 PM, (5) RE: # of ties per acleantrack1.ace texture, Roman, Jul-26-04, 07:53 AM, (6) RE: # of ties per acleantrack1.ace texture, callagst, Jul-26-04, 10:11 AM, (7) RE: # of ties per acleantrack1.ace texture, markhyams, Jul-26-04, 11:11 AM, (8) RE: # of ties per acleantrack1.ace texture, Mousy, Jul-26-04, 01:05 PM, (9) RE: # of ties per acleantrack1.ace texture, Roman, Jul-26-04, 03:07 PM, (10)
Conferences | Topics | Previous Topic | Next Topic
As you can see the ties are all out of whack, and this is taken from the BNSF Gallup Sub, an ultra-high use, Class 1 mainline! I did some measuring on the prototype, and I decided that 10 was a good compromise. With nine ties they were spaced a bit too far apart, and with 10 they were a bit too close, but I went with ten, because I thought it looked better. I was also careful to make them spaced evenly so the texture would tile properly. For whatever it's worth, with the new set of tracks I've created (Mtracks: 

This picture is of an A1t10mStrt.s piece. It has 16 ties in a 10-meter section, or 1.6 ties per meter, or a tie every 24.61 inches.
I didn't alter the ace file at all between the pictures. It's just that the shapes map the ace files differently. A quick test of a few other pieces shows that most of the longer pieces, like 250 and 500 meter straights are like the first pic, and most of the short pieces, like the 20 meter straight, etc. are like the second pic. I didn't find a third way that the ties were mapped, but then again I didn't look at and measure all of the pieces. I prefer the top picture, which gets very close to typical prototype spacing on a class 1 mainline. It's also how I've been mapping all of my Mtracks pieces too.Another thing we can shrug our shoulders at and say "why did Kuju do it this way?"Mark