If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #11864

Charter Member · 184 posts

What is Mtracks?I originally thought of it because of my first name, but then I came to think of it as Mainline Tracks. Here's what spawned its creation.Having become increasingly frustrated with the unprototypical default turnouts, I decided to take matters into my own hands. The problem with the Kuju turnouts, is that they have a continuous curve through the diverging leg of the turnout. This results in a very jerky ride when going through a crossover or onto a siding, because there is no straight track between the curves, a big no-no in track engineering. I also didn't like the tie layout for the kuju turnouts, as real turnouts have ties perpendicular to the straight leg of the turnout until the ties are 16 feet long or so.Most prototype turnouts curve up to the frog, and then have a straight frog, and then, in the case of a crossover, the track continues straight to the opposing frog, and then curves back into the points. Seeing no real reason why this couldn't be accomplished within MSTS limitations, I jumped head first into Gmax and the tsection.dat file, and although I'm still learning, I think I have come up with a very useful set of switches for any route.These turnouts are intended for mainline use. The current set of xtracks turnouts, which roughly correspond to No. 9 and No. 4.5 (3d and 6d modular, respectively) do a fine job for yards and industrial spurs and such. So I haven't created the mtracks turnouts in such a way that they can form yard ladders, these are intended for use out on the line: crossovers, sidings, going from single to double track mainline, branching off a mainline, etc. The complete set will include No. 15, 20, and 24 turnouts. Typical use puts these with 30, 40, and 50 mph speed limits, respectively, sometimes a little less. So far, I've completed sets of No. 15 and No. 20 turnouts, with the No. 24s to complete soon. The more I do, the faster I get!As you can see, there are no frog or guard rail assemblies, as I am brand new to 3d modeling, and I haven't even tried such fine modeling yet. The beauty of these turnouts is since they are all straight frog, only a single frog would need to be modeled for each turnout number, not needing a left and right version. Then they could be simply dropped in for a future update. I'm planning a future release with more detail as I learn more. These would be like an xtracks update, with you just replacing the shape files in the GLOBAL/SHAPES folder, without any messing around in the route editor.These turnouts are meant to be able to be dropped into an existing route with little modification. The lenghts of them are all in multiples of 5, so as to make for easy insertion. Another nice thing is that they take up far less room than the Kuju turnouts, for their sharpness:No. 15 siding: 115 meters
No. 15 crossover: 110 meters
No. 20 siding: 145 meters
No. 20 crossover: 135 meters
No. 24 siding: 170 meters
No. 24 crossover: 160 metersThe No. 24 is less sharp than the Kuju 2.5 degree turnout, which takes up 250 meters for a crossover, an extra 90 meters!The frog angles:
No. 15: 3.814 degrees
No. 20: 2.862 degrees
No. 24: 2.386 degreesBut wait, there's more!I also am planning a set of straight double and triple tracks with closer, more prototypical 14-foot track centers. These have the added bonus of having no gap in the ballast between tracks, and shortening turnout and crossover lengths by 10-20 meters. These unfortunately wouldn't be very useful to existing routes, but would be relegated to new routes, as curves would be required to be made with dynamic track.Here are some pics of what I've done so far:Going by a No. 20 crossover
Announcing Mtracks – image 1Going by a No. 20 crossover
Announcing Mtracks – image 2Going through a No. 15 crossover, that is a No. 15 off to the right as well
Announcing Mtracks – image 3No. 15 turnout
Announcing Mtracks – image 4No. 20 crossover
Announcing Mtracks – image 5No. 15 crossover
Announcing Mtracks – image 6No. 15 turnout
Announcing Mtracks – image 7No. 15 turnout
Announcing Mtracks – image 8Spiral easement curve to a 1-degree curve
Announcing Mtracks – image 9
What's this you say? I've been messing around with creating spiral curves. These "ease" you into the curve, and give a much smoother ride, especially at high speeds. What's shown here, the spiral starts where the double track ends on the right, and there are four pieces of increasing radius, finally connected to the main curve 400 feet later. I don't really know how practical this is, as there would be so many different pieces required. Basically a new set of spiral pieces for every different curve radius.An easy way to find out what turnouts are used on your route is to look up timetables on-line and find out the speed limits associated with a particular turnout. If you happen to be modeling a BNSF line, they have all their timetables on their website. I checked out the Marias Pass route, for example, and most of the crossovers are No. 20. Just drop em in!Right now, I awaiting a response from the master of the tsecion.dat file, so I can get some numbers allocated for these tracks. In the meantime, I could use some testers. This would involve making a backup of your current, non-default, tsecion.dat, copying a new tsection.dat file to the GLOBAL folder, and copying some new shapes into the GLOBAL/SHAPES folder. Only the number 24 to go! I was also thinking of doing a No. 32.75 turnout that I hear Amtrak uses on the NEC line. These are good up to 80 mph!Mark

Moffat Road Tabernash to Phippsburg
All track complete
Currently working on tunnels and bridges

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

RE: Announcing Mtracks, Phil06, May-03-04, 11:41 PM, (1) RE: Announcing Mtracks, markhyams, May-04-04, 00:33 AM, (2) RE: Announcing Mtracks, jdtrainman, May-04-04, 02:06 AM, (4) RE: Announcing Mtracks, century242, May-04-04, 00:54 AM, (3) RE: Announcing Mtracks, Hawk, May-04-04, 05:31 AM, (5) RE: Announcing Mtracks, markhyams, May-04-04, 08:17 AM, (6) RE: Announcing Mtracks, OTTODAD, May-04-04, 07:47 PM, (7) RE: Announcing Mtracks, markhyams, May-05-04, 10:18 AM, (8) RE: Announcing Mtracks, OTTODAD, May-05-04, 11:07 AM, (9) RE: Announcing Mtracks, muskokaandtahoe, May-05-04, 01:14 PM, (10) RE: Announcing Mtracks, markhyams, May-05-04, 09:55 PM, (11)

Conferences | Topics | Previous Topic | Next Topic

Member since Feb-11-04 · 13 posts

RE: Announcing Mtracks

Those look awesome Mark! I will definately use those new turnouts. It's about time we got better mainline trackage. What an improvement over the Kuju turnouts. In the pics you have of the crossovers, there is still a gap between the ballast. Will I be able to create double track mainlines with no space and still use those swithes for crossovers (length issues)?Keep up the great work!-Phil

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 184 posts

RE: Announcing Mtracks

Phil,The double tracks I was referring to with 14-foot centers will have their own crossover middle piece with the correct length. Basically, there is one point piece for each turnout number, and then a middle crossover piece. You put the point pieces on either end of the middle piece, and you choose the middle piece based on either default track spacing or the new 14-foot "M" spacing, as I like to call it. I'm releasing the default spacing pieces first, and then the next step will be to do the 14-foot spacing pieces. Does that make sense? So the answer to your question is: YES!Mark

Moffat Road Tabernash to Phippsburg
All track complete
Currently working on tunnels and bridges

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-8-03 · 1008 posts

RE: Announcing Mtracks

Why not just apply for an allocation in the global tsection pool for your M-tracks? BTW: they look great!JBD

Jim Duncan
Midwest Rail Group

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Dec-13-03 · 142 posts

RE: Announcing Mtracks

Hey Mark,
I'd most defiantly be interested in beta testing your tracks. You should still have my e-mail address.Hawk

Last night I heard an old freight whistle blow, as I was sleeping warmly in your bed-And it told me "Boy, it's time that you was packin' up to go.", but I smiled and shook the leavin' from my head.

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 184 posts

RE: Announcing Mtracks

Erik,Send me an email or private message with your email so I can contact you directly.Mark

Moffat Road Tabernash to Phippsburg
All track complete
Currently working on tunnels and bridges

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 184 posts

RE: Announcing Mtracks

LAST EDITED ON May-05-04 AT 10:19 AM (EDT)

Eventually I would like to have something more realistic than the overlapping rails. But, as I said above, I am brand-spankin'-new to this 3d modeling thing, and I don't feel my skills are up to it yet. Right now I'm trying to get the shapes out the door, so interested people can start using these, and then I'll go back and update the shapes, which wouldn't require any route editor time to update, merely copying the new shapes into the GLOBAL/SHAPES folder.If anyone is interested in helping me out with some frogs and guard rails let me know. Since all the frogs are straight, I only need one for each turnout number (no need to bother with left and right versions): 15, 20, 24, and then I can just add it into my existing gmax files. Tips and tricks appreciated!I'm all for detail, but as you know, since these are mainline turnouts most of the time you'd be going over them pretty quick, and those frogs would go by pretty fast at 30, 40, even 50 mph! But I agree I need to do something other than the overlapping rails.Hopefully it might end up looking something like this (taken from the Digital-Rails website on their upcoming Powder River route)
Announcing Mtracks – image 12Mark

Moffat Road Tabernash to Phippsburg
All track complete
Currently working on tunnels and bridges

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 4827 posts

RE: Announcing Mtracks

Hi Mark !Being a Tracks fanatic, as you might have gathered, this is another MUST HAVE Route, just because of their Tracks and Switches. Thanks for the "Heads Up" ! There is a preliminary Download for Y-TRACKS in the File Library. Downloading that one and snooping into their .s files might give you some hints ? Same goes for the Digital Rails and SCALERAIL tracks once you can lay their hands on them.I am no Graphics expert, I just help my friends testing them, pointing out where I see room for improvement. There are loads more coming from Y-TRACKS, hopefully also a replacement for the Default MSTS 10d switches Okrasa has vastly improved already and make them look like Y-TRACKS switches, another guy has asked about.O t t o

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-8-03 · 558 posts

RE: Announcing Mtracks

Announcing Mtracks – image 13

Please don't overlook #9, #10, and #11 turnouts as they were very, very common mainline turnouts in the late steam era.Dave NelsonWP mainline, Oakland-Stockton: 100% complete;
SP mainline, Oakland-Stockton: 20% complete;
Aug 1950 Announcing Mtracks – image 14
<<new .sig under construction>>

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 184 posts

RE: Announcing Mtracks

Dave,Not sure if I'm going to be tackling these sizes. Did you realize that the xtracks modular 3d switches are pretty much exactly a #9? Also the new Y-tracks switch seems to be about that as well. Given that these are so close to #10 and #11, I probably won't be tackling these sizes until later, if ever. Maybe a #11, as there is just as much of a difference from #9 to #11 as there is from #20 to #24 (percentage-wise). Thanks for the interest, though!Cheers,
Mark

Moffat Road Tabernash to Phippsburg
All track complete
Currently working on tunnels and bridges