Train-Sim.Com
MSTS Route Design

AMTRAK NEC Extensions

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #11431

Member since Feb-10-04 · 3 posts

Is anyone working on the NEC from Philly to NY? From NYC to Boston? (and yes I have the MBTA Providence to Boston)

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

RE: AMTRAK NEC Extensions, ACRHumanResources, Feb-10-04, 05:16 PM, (1) RE: AMTRAK NEC Extensions, Mirai Zikasu, Feb-10-04, 07:21 PM, (2) RE: AMTRAK NEC Extensions, rodmanb294, Feb-11-04, 07:42 AM, (3) RE: AMTRAK NEC Extensions, ACRHumanResources, Feb-11-04, 09:47 AM, (4) RE: AMTRAK NEC Extensions, gxm149, Feb-11-04, 10:36 AM, (5) RE: AMTRAK NEC Extensions, Vince, Feb-11-04, 02:42 PM, (6) RE: AMTRAK NEC Extensions, ACRHumanResources, Feb-11-04, 07:41 PM, (7) RE: AMTRAK NEC Extensions, gxm149, Feb-13-04, 10:22 AM, (8)

Conferences | Topics | Previous Topic | Next Topic

Member since Oct-7-02 · 274 posts

RE: AMTRAK NEC Extensions

Don't mean it as a flame, but why don't you do it if you think you can??Doing that long of an extension blind (without any real track layouts) is extremely difficult. ZOO interlocking itself would make a potential route builder/modifier's turn cross eyed.Stuart D. Guberman
Chief Operations Officer
Atlantic Coastal Railway
http://www.atlanticrail.com
P32 & Electric MU Engineer
MTA Metro North Railroad
http://www.mta.info/mnrPresident, The ACR (Virtual) LocoWorksAMTRAK NEC Extensions – image 1

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-29-03 · 56 posts

RE: AMTRAK NEC Extensions

Well, personally, I'm up to doing an extension of the NEC once I can get my hands on some track charts. However, until then, I find it more important to improve what we've got. (change signals, rework track, upgrade Amtrak stations to high level platforms, remove/redo catenary gantries, et cetera)

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Oct-7-02 · 274 posts

RE: AMTRAK NEC Extensions

Sweet jesus...I don't know how long I've been looking for diagrams of this section of the line....Okay....then all we need is an intrepid bunch of people to begin the construction itself. And to use the Pennsy signals that Hank S. just uploaded a short while ago.Stuart D. Guberman
Chief Operations Officer
Atlantic Coastal Railway
http://www.atlanticrail.com
P32 & Electric MU Engineer
MTA Metro North Railroad
http://www.mta.info/mnrPresident, The ACR (Virtual) LocoWorksAMTRAK NEC Extensions – image 2

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 434 posts

RE: AMTRAK NEC Extensions

LAST EDITED ON Feb-11-04 AT 10:37 AM (EST)

I have been working on a NEC Extension for a while now actually. I have been keeping quiet about it after what happened with the Middle Division Route of the PRR however. I am using the old PRR track charts that were posted a long time ago in the forums along with maps from other sources. Right now I have lines for the Septa tracks laid to the Fox Chase station and the Jenkintown station. I also have the NEC tracks laid to around the Neshaminy/Bensalem area near the Park and Ride for Septa. With working full time and graduate school it is taking a while and I do not want to post screenshots until it is further along. I have also needed to change some of the tracks from real life in order to make it work with the sim. Particularly at the underground section running from 30th Street Station past the Suburban Station and Market East Stations due to a lack of 4 track tunnels. Hopefully this will answer your question.

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 707 posts

RE: AMTRAK NEC Extensions

LAST EDITED ON Feb-11-04 AT 03:07 PM (EST)

Stuart,I have track and signal maps for the NEC from CP Avenue (Washington) to I think the Trenton NJ area. The Philadelphia Terminal Area includes the Zoo Interlocking. These are official Amtrak maps circa 1992.I have them all in a 650Kb zip file.
Will send them to you if you want.

Regards,
Vince Cockeram
NEC Track Team
Author of the NECv4 Route

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Oct-7-02 · 274 posts

RE: AMTRAK NEC Extensions

Thanks, but I'm working on a route of me own (the supposedly to be built Florida High Speed Corridor) --- only the full kit and kaboodle.Stuart D. Guberman
Chief Operations Officer
Atlantic Coastal Railway
http://www.atlanticrail.com
P32 & Electric MU Engineer
MTA Metro North Railroad
http://www.mta.info/mnrPresident, The ACR (Virtual) LocoWorksAMTRAK NEC Extensions – image 3

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 434 posts

RE: AMTRAK NEC Extensions

Vince, I was wondering if I might be able to get a copy of the Amtrak track charts for the NEC in the Philadelphia area that you were talking about. They would be more current than the older Pennsylvania Railroad track charts that I have been using, George.

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2004 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured March 26, 2004. About this archive.