Train-Sim.Com
MSTS Route Design

Placing Signals and the M key

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #10595

Member since Aug-25-02 · 167 posts

LAST EDITED ON Sep-30-03 AT 09:08 PM (EDT)

Occasionally when placing interactive objects like signals ,I use the N and H keys to straigten and level the signal posts and sometimes Ive accidentally hit the M key instead of N and it seems that this key has some strange function in that the signal post becomes unlinked from the red signal marker on the track and then seems to behave like a static object.
Attempting to remove the red signal handle then crashes the SIM.Does the M key have any documented function at all.thanks
MD

MD

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 1290 posts

RE: Placing Signals and the M key.

It solidifies wireframe objects.Timtimmuir@wcn.net

Electric Railroad 3D Models
Sumpter Valley B&B Gang
Willamette Valley Route
(No timetable for release)

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2002 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured October 28, 2003. About this archive.