Train-Sim.Com
Microsoft Train Simulator

News from Team GM&O

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #17614

Member since Apr-8-03 · 142 posts

Several things happening at Team GM&O the past several days!!!First, the Bloomington Car Shops personnel have recently acquired four former Delaware & Hudson baggage cars to supplement head-end needs on the Chicago-St. Louis trains. These cars have been re-lettered to Gulf Mobile and Ohio however they retain their original D&H colors.Second, the Bloomington Engine Shops have received several new Alco RS-3's which are now ready for assignment to local and yard service on all divisions.Finally, the Engineering Department is pleased to report the completion of track between Fulton and Mexico, Missouri. Test train service will soon begin on the South Branch to be followed soon by the opening of rail service between Fulton and Mexico with stops at Ortiz, Auxvasse, McCredie, and Callaway.Having completed the current trackwork project, the Engineering Department has been tasked with laying track eastward from Mexico to Louisiana, Missouri, and from Roodhouse, Illinois, westward to Louisiana, Missouri. Major bridges will need to be built at Pearl (Illinois River) and at Louisiana (Mississippi River) before service can begin.We also have received communication from the Burlington Route Engineering Department informing us that construction is underway along the west bank of the Mississippi River between Hannibal, Louisiana, and Monroe, Missouri. Their line will cross the GM&O just west of the planned swing-span bridge over the Mississippi River.JBD

Jim Duncan
Team GM&O

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2002 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured May 13, 2003. About this archive.