LAST EDITED ON Sep-04-03 AT 11:13 AM (EDT)
Engineering works will take place between 4/09/2003 to 24/11/2003This will consist of new points and track being laid between Moorfeild and westport and a update to signalling. A special bus service will be in place departing every 30 mins throughout the day.Network Rail apoligise to any inconveniance caused.Any quieres please contact by E mail the following address.shaneroberts(at)fsmail.netremove (at) and replace with @
In English
(Moorfeild to westport will recieve curved track and switches and new signals)Join the TOC Game
koti.mbnet.fi/rogorox
Printer-friendly page | Edit | Reply | Reply With Quote | Top
RE: Engineering Works, Tim Frost, Sep-04-03, 12:53 PM, (1) RE: Engineering Works, Central trains, Sep-04-03, 06:13 PM, (2) RE: Engineering Works, chris_rogers, Sep-04-03, 07:31 PM, (3) RE: Engineering Works, Central trains, Sep-05-03, 02:32 AM, (4) RE: Engineering Works, cl180, Sep-05-03, 04:53 AM, (5) RE: Engineering Works, chris_rogers, Sep-05-03, 05:19 AM, (6) RE: Engineering Works, cl180, Sep-05-03, 07:17 PM, (7) RE: Engineering Works, mailer_diablo, Sep-06-03, 02:14 PM, (9) RE: Engineering Works, Wulf_9, Sep-06-03, 09:22 AM, (8)
Conferences | Topics | Previous Topic | Next Topic