Train-Sim.Com
BVE

Chippenham-Worcester Shrub Hill Progress Report

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #548

Member since Jul-4-03 · 17 posts

The Chippenham - Worcester line has Phase one nearly complete!
Phase 1 will be availible shortly and includes:
-Box Tunnel
-Middle Hill Tunnel
-Markers pointing out Historical points
-Thingley Junction
-Bathampton Junction
-Sydney Gardens
-BathPLEASE NOTE that this is SEMI-FICTIONAL meaning all the names, station mapping, trains will be non-fictional BUT most of the scenery will be fictional, although I've tried to make it look more non-fictional.
I've yet to do:
-Signals
-Adding some more trains
-Some more station scenery
-Sounds
-Permission!

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

RE: Chippenham-Worcester Shrub Hill Progress Report, TomBeevers2000, Jul-05-03, 09:32 AM, (1) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-05-03, 11:23 AM, (2) RE: Chippenham-Worcester Shrub Hill Progress Report, TomBeevers2000, Jul-05-03, 12:33 PM, (3) RE: Chippenham-Worcester Shrub Hill Progress Report, NathanWhitington, Jul-05-03, 01:22 PM, (4) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-05-03, 01:41 PM, (5) RE: Chippenham-Worcester Shrub Hill Progress Report, tube_dude, Jul-05-03, 02:01 PM, (6) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-05-03, 02:28 PM, (7) RE: Chippenham-Worcester Shrub Hill Progress Report, John O, Jul-05-03, 03:03 PM, (8) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-05-03, 03:17 PM, (9) RE: Chippenham-Worcester Shrub Hill Progress Report, John O, Jul-05-03, 03:24 PM, (10) RE: Chippenham-Worcester Shrub Hill Progress Report, NathanWhitington, Jul-05-03, 05:51 PM, (11) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-06-03, 05:07 AM, (12) RE: Chippenham-Worcester Shrub Hill Progress Report, TomBoyRacer, Jul-06-03, 07:04 AM, (13) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-06-03, 08:57 AM, (14) RE: Chippenham-Worcester Shrub Hill Progress Report, Tim Frost, Jul-06-03, 11:24 AM, (15) RE: Chippenham-Worcester Shrub Hill Progress Report, Central trains, Jul-06-03, 11:35 AM, (16) RE: Chippenham-Worcester Shrub Hill Progress Report, TomBoyRacer, Jul-06-03, 11:40 AM, (17) RE: Chippenham-Worcester Shrub Hill Progress Report, tube_dude, Jul-06-03, 11:55 AM, (18) RE: Chippenham-Worcester Shrub Hill Progress Report, TomBeevers2000, Jul-06-03, 03:34 PM, (19) RE: Chippenham-Worcester Shrub Hill Progress Report, Central trains, Jul-06-03, 03:43 PM, (20) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-06-03, 06:13 PM, (21) RE: Chippenham-Worcester Shrub Hill Progress Report, TomBoyRacer, Jul-06-03, 06:25 PM, (22) RE: Chippenham-Worcester Shrub Hill Progress Report, Mr Gizmo, Jul-06-03, 06:26 PM, (23) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-07-03, 05:00 AM, (24) RE: Chippenham-Worcester Shrub Hill Progress Report, TomBeevers2000, Jul-07-03, 02:24 PM, (25) RE: Chippenham-Worcester Shrub Hill Progress Report, TomBoyRacer, Jul-07-03, 04:22 PM, (26) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-07-03, 05:22 PM, (27) RE: Chippenham-Worcester Shrub Hill Progress Report, tube_dude, Jul-08-03, 03:03 AM, (28) RE: Chippenham-Worcester Shrub Hill Progress Report, mailer_diablo, Jul-08-03, 04:32 AM, (29) RE: Chippenham-Worcester Shrub Hill Progress Report, PCrail, Jul-08-03, 05:39 AM, (30) RE: Chippenham-Worcester Shrub Hill Progress Report, Wulf_9, Jul-10-03, 10:42 PM, (31) RE: Chippenham-Worcester Shrub Hill Progress Report, Routemaster J, Jul-11-03, 07:52 AM, (32) RE: Chippenham-Worcester Shrub Hill Progress Report, NathanWhitington, Jul-11-03, 10:44 AM, (33)

Conferences | Topics | Previous Topic | Next Topic

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

yeah and......Everyone knows its me DUH hence my username!!Anyway, back to the point as SOMEONE was posting pointless and OT stuff, I have done the Signal, magnets, Sounds and now the big part, Making my first HST in 'Barbie' Livery.
If anyone wants a screenshot of Bath (so far) or Box Tunnel, Bathampton Jct or Thingley Jct, give me a shout

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-8-03 · 104 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 3

Pardon me for butting in folks, but I think somebody was already doing this route, and I can not disclose that person's name because it might not be common knowledge that that person is making the route.......could you please confirm (you know who you are).....--
Nathan Whitington

http://members.aol.com/nwhitington

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

No website yet mate, will be up when the route is out.AFAIK there will be a Paddington - Reading and a Penzance - Paddington (by the BVE brothers, if your interested)

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

>Well, not so welcome really, associated with the BVE Bros? Why >doesn't that surprise me :p Am I! No I ain't, If i was, I would be doing the penzance line!!!!!!!!

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-24-03 · 58 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

LAST EDITED ON Jul-05-03 AT 03:30 PM (EDT)

Dunno, it's probably a matter of personal opinion. In most you will be welcomed with all arms open I'm sure... that'll be the day.

John
======================================================
The railway sound and movie network
http://www.rwysnd.btinternet.co.uk

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-19-03 · 104 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 9

I must admit, for a newcomer, you know the history of this place pretty well...

Routes for BVE

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

?If you mean the line I'm doing, Its because I live near it and use it alotIf you mean here, I've been here plenty of times before this BVE forum started to build up

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-9-03 · 259 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Click to send message via ICQ

Chippenham-Worcester Shrub Hill Progress Report – image 10

Ok, I don't like it any better than the rest of you but if James wants to be a productive member of the community, don't stop him. He obviously is doing this route, he posted a screenshot, so unless he gives us a NEW good reason to do otherwise, why not just leave him alone?Tim Frost
NVTA Subway routes for BVE:
http://nvta.co.uk
Chippenham-Worcester Shrub Hill Progress Report – image 11

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-20-03 · 50 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

>Ok, I don't like it any better than the rest of you but if
>James wants to be a productive member of the community,
>don't stop him. He obviously is doing this route, he posted
>a screenshot, so unless he gives us a NEW good reason to do
>otherwise, why not just leave him alone?
second that

Chippenham-Worcester Shrub Hill Progress Report – image 12
http://www.bve-midlands.tk

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-19-03 · 104 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 13

I have no problem with someone being here as long as they behave themselves, and i'm always willing to give someone the benefit of the doubt. that way you uphold your end of the bargain.

Routes for BVE

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 92 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 16

Right, I now don the Lord High Executioner's hat and stick my oar in (I am not trying to do Wulf's job for him...) ...James was banned for a very good reason. He should, IMO, remain banned. You don't unban someone for no reason. --
Tom Beevers
http://brj.rr.nu

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-20-03 · 50 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Where is wulf latly? i aint seen him around this forum and he aint posted anything for a while.If he is producing something fare well we should give him his support!
but with being banned thats up to the Mods whether or not he should be aloud back! Everyone deserves a second chance and if he does do what ever he did to start with then he should be kicked out.Dont hate me for this its just an opinion and on the bright side he has showed us he is doing something good and contributing to the BVE community

Chippenham-Worcester Shrub Hill Progress Report – image 17
http://www.bve-midlands.tk

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Yeah I'm planning to keep my cool HERE, and hows a route affecting the enviroment!Cheers Damon, You obviously know the line well!
So far I have kept the line in hold until I complete the line to Bristol (I have got to Bristol, just needs some bit of extra scenery) and from there you will be entitled for a 5 min break then heading to the other end of the train and going back the way you came (for a bit) whilst then going on towards Dr Days Jct and on from there through Bristol Parkway and Yate then into Worcester Shrub Hill.

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-19-03 · 104 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 18

are you actually going to do the scenery at bristol? i wouldn't reccomend it

Routes for BVE

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since May-3-03 · 14 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

LAST EDITED ON Jul-06-03 AT 06:32 PM (EDT)

JamesStop me if im worng (and i dont think i am by the way), but you have missed out 4 stations between yate and worcester..... normally only 3 but there can be 4 depending on the service.....further more may i point out, and im not picking on the route, its is only FGW and wessex trains oh and central that run services to Worcester Shrub hill and they start from london Paddington and Bristol Temple meads and cardiff respectively.For those that are unware...... James is a known trouble maker, hence his less then welcome reception to his latest entrance to the forum!Mr Gizmo

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

I havent missed out stations, I was exampling, but still......Yes I am doing scenery of Bristol, but remember it will be all fictional ecxept for some of it.Yes I know they all start at paddington, but you are the person on 'Driver Change' at Chippenham.
Also included in the Chippenham to Bristol section will be a 150/2 service calling at Bath Spa, Oldfield Park, Keynsham and Bristol T.M platform 8.

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-19-03 · 104 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 20

Jamez:
in order for you to have any hope of being redeemed in this community, you have got to prove that you've changed your ways, otherwise you are not welcome. you continually show up under pseudonyms and are usually quickly detected. this is of danger to newcomers who might be enticed by your delusions of grandeur, especially into helping you make stuff and your many unfinished projects in the vapourware category. we've had enough of the copyright violations, the deceit and the bickering that goes on, often as a result of what people like you do if unchecked. myself and the other crotrainz veterans all know what you've done in the past, and I think I can speak for us all when we say that we've gone beyond caring anymore. your reputation speaks for itself by the result of you simply appearing here. these forums exist for the furthering of BVE as a medium, and you've done a pretty good job of getting in the way of that. to newcomers, the treatment you have recieved thus far seems unwarranted, but in my opinion, you've got off lightly. you come here with your Bristol route and one screenshot of bath and this is supposed to constitute an entire route. we are not vindictive by nature, we are just wary of you in general and the stunts you have pulled in the past. so why don't you show us your screenshots of bristol et al within a suitable time to prove that you actually have done what you said. and maybe this will go some way towards proving you don't have bad intentions. if you can't show some form of repentance, this waste of time and energy expended in typing will continue. i should reiterate you are treading on thin ice here.

Routes for BVE

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Well yes i would post more pictures if my broadband wasnt running like 56k! Its taken me 20mins to post one picture!I'm sure Tube_Dude will be willing enough to post the screenshots I gave to him, even though they are un-finished, and Bristol hardly has anything exept for some scenery (platorm, plaform building, canopys and a fictional raod to the side) though I yet need to make Oldfield and Keynsham look right before posting them, I pulled out summit wrong there as Oldfied is as busy as hell!

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Charter Member · 146 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 21

Here are some screenies that james has sent.
I cn't think badly as I don't know what he has done.
These are WIP Screenshots.Chippenham-Worcester Shrub Hill Progress Report – image 22
Visit my site at- www.bvedepot.co.uk

Attachments
Chippenham-Worcester Shrub Hill Progress Report – image 23
http://www.train-sim.com/dcforum/User_files/3f0a6b92265ec0ae.jpg
Chippenham-Worcester Shrub Hill Progress Report – image 24
http://www.train-sim.com/dcforum/User_files/3f0a6bd726d84ebe.jpg
Chippenham-Worcester Shrub Hill Progress Report – image 25
http://www.train-sim.com/dcforum/User_files/3f0a6c002756db81.jpg

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Jul-4-03 · 17 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Hey thanks tube_dude.The First picture is the unfinished Bathampton Jct, Second is Bath Spa unfinished and the scenery in the last pic is done but the HST is supposed to be there temporary (or ?I would sow you a pic of 1 HST car, wouldnt look right)

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-7-03 · 360 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 28

Well,I notice that he has registered under his own name, which is not generally indicative of intent to deceive... like others have said, time will tell.James, if you are now working on some original material, then more power to your fingers, however a word of warning here : if you stuff up or upset any members of this board, or anyone I call my friend, you are gonna feel like you've been f*cked by a freight train... 'nuff said.CiaoSaxon Locomotive Works - "The difficult we do immediately; the impossible takes a little longer"http://www.zodiac-infosystems.co.uk/rail/bve

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-14-03 · 186 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 29

To be honest, I don't want to raise alarm bell again, but have you actually nade ANY objects featured in those screenies? Sorry, I don't want to say this, but please be sure that this isn't going to be a "other peoples objects put together route with some poorly modified textures". Also with regards to the FGW HST, please try better it looks nothing like it! Look at the way you wrote First! Also I'd advise not semi-modifing either, taht is clearly a Virgin HST and the front has been left unchanged. I don't want to open up a can of worms though. This is the last I will say about this, but be warned if you do anything untoward rearding objects made by otehr people and then you haven't heard from the last of me yet...I am fully awar that this is a WIP screenie, but the least you could do is explain whose objects if not yours you have borrowed or modified.

Joshim,
currently constructing the DLR Route for BVE & Oxford Street BUS ROUTE! Check out my website http://joshimsbveroutes.gamehorizons.net/

Alert | IP

Printer-friendly page | Edit | Reply | Reply With Quote | Top

Member since Apr-8-03 · 104 posts

RE: Chippenham-Worcester Shrub Hill Progress Report

Chippenham-Worcester Shrub Hill Progress Report – image 30

>To be honest, I don't want to raise alarm bell again, but
>have you actually nade ANY objects featured in those
>screenies? Sorry, I don't want to say this, but please be
>sure that this isn't going to be a "other peoples objects
>put together route with some poorly modified textures". Also
>with regards to the FGW HST, please try better it looks
>nothing like it! Look at the way you wrote First! Also I'd
>advise not semi-modifing either, taht is clearly a Virgin
>HST and the front has been left unchanged. I don't want to
>open up a can of worms though. This is the last I will say
>about this, but be warned if you do anything untoward
>rearding objects made by otehr people and then you haven't
>heard from the last of me yet...
>
>I am fully awar that this is a WIP screenie, but the least
>you could do is explain whose objects if not yours you have
>borrowed or modified. OK so hes used someone elses objects, I thought we were a community here? and it really is a matter of opinion whether one thinks the textures are "crap" or not. Now I'm not taking sides here, but I think your post was a bit too far. In my WAGN route, which is still in production, I have used someone esles Catenary objects and many other objects that simply aren't worth duplicating. What's to say that some of my textures aren't of "poor quality" does that mean my work too is crap? and what about everyone else? Just because you have produced a route which uses entirely your own objects, and your own work, doesn't mean that everyone elses is crap. I like all the work I have seen so far each is their own artwork, art has no right or wrong, but is a representation of the real thing in a persons eyes, be it James's or the Pope's (not Julian). I am willing to provide any objects I have already created for your project james, if you email me off group I'll sort something out. The same applies to anyone, and soon I'll put my objects online for all to use, obviosuly I'd like credit for using them, but the main thing here is that I'm willing to share, even though it looks like some of you aren't.--
Nathan Whitington

http://members.aol.com/nwhitington

Alert | IP


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2002 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured July 20, 2003. About this archive.