Notice to all visitors and members of the Train-Sim.Com message forums: If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.
It was a dark and stormy night and our man needed to get home. The roads are closed, and no 4 x 4's to be found. The Airports are closed and the railroad is booked solid. It is about 2 am a few miles south of Phil. BTW, unlike some of my friends, our man here did make it home in about 8 hours.
Hope that lamp has an EXTRA LONG LASTING BATTERY!!!LMAO!Projects - 421 class Public Transport Commission of New South Wales diesel electircs: Fuel & Air tanks - 100% No. 2 end - 88% (Pilot details and number boards/headlights need to be added) No. 1 end - 08% (Work on the pilot has been started as a base for the nose ) Sides - 45% (frame work is up, about 2/3 of panels on) Overall - 16.9% - 422 class New South Wales Government Railways diesel electircs: On the drawing boards for a project after the 421's. Overall - Not official
With oil the price it is today, hope he has got a dollar or two.Projects - 421 class Public Transport Commission of New South Wales diesel electircs: Fuel & Air tanks - 100% No. 2 end - 88% (Pilot details and number boards/headlights need to be added) No. 1 end - 08% (Work on the pilot has been started as a base for the nose ) Sides - 45% (frame work is up, about 2/3 of panels on) Overall - 16.9% - 422 class New South Wales Government Railways diesel electircs: On the drawing boards for a project after the 421's. Overall - Not official