Notice to all visitors and members of the Train-Sim.Com message forums: If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.
Could the IM cranes be programmed so that they operate while they are not the selected vehicle in the game? It takes a lot of time to unload and load 40 or more cars. I'd like to handle trains while (un)loading IM trains.
I agree with Yellowsignal. I can understand the cranes moving slowly, but it would be nice to be able to do something else while loading/unloading IM. How does everyone else feel about this?
I agree as well. Keep them running slow, but let us be able to work other trains at the same time.Paul Metzger Sup. of Map Connections/ DDR/TrainmasterCP Rail System (D&H) "Courtesy keeps customers"
I talked to Jim about this a while ago and he did have a pretty good reason for not doing it, let him explain it to you.I agree that it takes longer but Jim said it pretty much had to be that way.Chris Lee Train Artisan