Notice to all visitors and members of the Train-Sim.Com message forums: If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.
Q: It occurs to me that as more maps get developed, getting charged $300 to move between maps could get to be very excessive. Consider a scenario where I have a Selkirk-Calumet train and utilizing only those maps currently on-line and that I have in development:Selkirk-Berea: -$300 Berea-Greenwich: -$300 Greenwich-Fostoria: -$300 Fostoria-Dolton: -$300 Dolton-Barr: -$300 Upload to server for Team NS: +$1000Thus, I've spent $1500 to move the train to its connection, yet I'll only receive $1000 for delivering it! Abusing a hackneyed expression, "That's a heck of a way to run a railroad." I suppose this could be offset by making local deliveries, but still, the point of railroads operating a service is to make a profit -- and where's the profit if I lose $500 to deliver to a "competitor?" (Yes, I know, we're all one big team here, but it's human nature to want to compete!) So, in due course, you may wish to consider lowering the ride-between-maps charge.Dave HonanA: Yea, the prices will change over time, based on feedback from people (like you) who actually care about the financial system. I may re-think the download & upload costs. I'm not sure they have a purpose anymore. I originally set the prices to encourage people to upload more than downloading, but it seems like everyone uploads plenty.Jim
I admit that I didn't like the idea of the money system when first getting back into the new build of YD. However after giving it a try I find that the system doesn't even effect my gameplay the slightest. I had money problems at the beginning and was even worried about making payroll(labor for cars, switches, travel) however after delivering a few trainst the hardway I was sitting pretty at 300K and wasn't worring anymore. Chris Lee Train Artisan
Yeah, I remember telling you it was something you could ignore. But here's another challenge for you Chris. Turn the mainline trains on and set it to 5 minutes and see how long that $300K lasts! Jim
Hi.. I think a better system would be, it you go from one map to the next one it should only cost (say) $50, so if you where to travel over a few maps then it would cost more (2 map $50.00, 3 maps $100.00, 4 maps $150.00 and so on), then if the train is posted to the server, you should get back you money and then say 20% more.I know this mite be hard to do but it would make it very intresting.Stuart..