Train-Sim.Com
Route Specification Forum

Kicking Horse Pass 2.0

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Locked thread - Read only
Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #129

Charter Member · 2638 posts

LAST EDITED ON Mar-21-04 AT 08:59 AM (EST) by robertreedy (moderator)

Route Name - Kicking Horse Pass 2.0Version - 2.0, Mid 2003Description - MLT's first offering was Kicking Horse Pass 1, released about 6-8 months after MSTS, and was regarded as one of the best payware routes. Version 2 adds about 40 miles to the east end of the route, and improved upon what few things needed to be touched up, mostly with newer tree and ground textures. Better trainsets also are included thanks to a licence with CP to use logos and names.KHP as it is known is the Canadaian Pacific Railroads crossing of the Rocky Mountains, and does so in a most unusual way, by having trains go through not one, but two loops in a area known as the Spiral Tunnels. The tunnels helped make the deadly original 4% grade a more easier to traverse,less than 2% grade. The scenery on the route is equally as impressive as the route itself. KHP is often referred to in true life has one of the most scenic routes in the railroad world. Packaging - Route comes on CD and installs by clicking on the set up icon ProtoypicalFrieghtEra - 1990'sLocation - Western Canada, between Field and Ozada, CP's crossing of the Rocky MountainsMainline - about 90 miles longBranches - No brachesSidings - Route contains about 10 passing sidingsNumber of Yards - 1 at Field and 2 smaller yards at Banff and CanmoreDual/Single Track - 30% dual, 70% single.Scenery - Route is complete with heavy trackside detail. Low end users may need to adjust options to get better FPS on this route.Activities - Route comes with about a dozen activites, plus others can be downloaded from train-sim.comRequired downloads - No non default trainsets or track sets are required. Route comes with a large assortment of custom engines and rolling stock in CP paint.Payware.Route can be ordered from http://www.mapleleaftracks.com {Edited rr for format}Chris Bogley
Syracuse New York
www.msnusers.com/AshleyPhotography
www.msnusers.com/tehachapirails3rd shift Production Lead, Krispy Kreme, East Syracuse NY. www.krispykreme.com

Printer-friendly page | Top


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2004 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured May 17, 2004. About this archive.