As of this afternoon, the Elkhorn Extension and all of it's nefarious branches, some built as early as 1920, others as late as 1979 was completed, and attention turned to completing the minor track details south of Sandy Ridge. The first item was to complete Bear Wallow Hollow's extensive (and HEAVILY GRADED) access branch, which was possible following last weeks addition of 24 more tiles to the route.Attached is the view that a surveyor would have today, if this branch had not been pulled up around 1950 or so, and with State Route 63 following the left side of the hollow in its climb over Sandy Ridge. SR-63 is the main road between Elkhorn City and St.Paul, maybe the only road.The switchbacks on this branch have 5% grades, and there are very abrupt changes in gradient thanks to the lack of verticle curves in MSTS. For example from one 10m piece to another, the change is .3, whereas on the mainline I held it to .05.J. H. Sullivan
Attachments
http://www.train-sim.com/dcforum/User_files/3deaa090265f1490.jpg
Alert | IP
Printer-friendly page | Edit | Reply | Reply With Quote | Top
Elkhorn Extension finished, with branches now---------- [View All], landnrailroader, 06:51 PM, Dec-01-02, (0) RE: Elkhorn Extension finished, with branches now------, Coonskin, Dec-01-02, 11:09 PM, (1) RE: Elkhorn Extension finished, with branches now------, yellowdog, Dec-02-02, 12:23 PM, (2) RE: Elkhorn Extension finished, with branches now------, landnrailroader, Dec-02-02, 01:28 PM, (4) RE: Elkhorn Extension finished, with branches now------, Coonskin, Dec-02-02, 04:03 PM, (5) RE: Elkhorn Extension finished, with branches now------, landnrailroader, Dec-02-02, 04:40 PM, (6) RE: Elkhorn Extension finished, with branches now------, dmikulec, Dec-02-02, 05:01 PM, (7) RE: Elkhorn Extension finished, with branches now------, 3footer, Dec-02-02, 05:04 PM, (8) RE: Elkhorn Extension finished, with branches now------, MRRextreme, Dec-02-02, 12:29 PM, (3)
Conferences | Topics | Previous Topic | Next Topic

