Train-Sim.Com
MSTS Route Design

Archived thread - Read only Previous Topic | Next Topic

Archived thread - Read only Previous Topic | Next Topic – image 1

Notice to all visitors and members of the Train-Sim.Com message forums:
If you plan on using a signature banner in your posts, we would like to remind you that there is a maximum size for banners. That maximum is 450 pixels wide by 120 pixels high, and not to exceed 25k. Your compliance is appreciated. FORUM RULES Problems? There are two common reasons for problems with logging in and posting messages. The first is that you are running a firewall that prevents your messages from being sent to the server. The other is that you have cookies disabled; the DCForum software requires cookies to work properly.

Archived thread - Read only
Previous Topic | Next Topic

Printer-friendly copy Email this topic to a friend

Reading Topic #108

Charter Member · 181 posts

I was just wondering around the internet tonight when I came across this. The Union Pacific yard at Roseville California covers some 780 acres, is 6 miles long, has 136 miles of track and 338 Turnouts/switches.
The stats on this place boggle the mind. 1785 cars switched daily.
600 locomotives repaired monthly.
2350 locomotive services monthly.
2,350,000 gallons of fuel dispensed monthly. I've been to and through Roseville several times, they must have this place hidden pretty good. I've never seen it. And something like this has got to stand out. It would be worth the drive from Reno to go and see the place. This kind of project for MSTS is only for the brave. Or the very insane. The editor is so unstable, I think that attempting anything substantial for the time being would be to invite many headaches. Have a great weekend!
Lonnie
KRNO

Printer-friendly page | Top


[ Home | MSTS Forum | MSTS FAQ | File Library ] Copyright © 2002 by Nels Anderson. All Rights Reserved.

Restored from the Train-Sim.Com archive, captured November 8, 2002. About this archive.